United States Department of Agriculture
Natural Resources Conservation Service
Vermont Go to Accessibility Information
Skip to Page Content




Vermont NRCS 2008 Practice Payment Schedule Scenarios

The following Payment Schedule scenarios were used for development of NRCS 2008 USDA Program Payments (AMA, EQIP and WHIP)

 

Note:  The payment scenarios are based on typical conservation practice installations in typical settings.  They do not include extra costs incurred by unusual or extreme circumstances encountered during practice installation.

The following documents require Adobe Acrobat.

Access Road

Agrichemical Handling Facility

Anaerobic Digester - Controlled Temperature

Animal Mortality Facility

Animal Trails and Walkways

Brush Management

Closure of Waste Impoundments

Composting Facility

Comprehensive Nutrient Management Plan

Conservation Crop Rotation

Contour Buffer Strips

Cover Crop

Critical Area Planting

Diversion

Early Successional Habitat Management

Feed Management

Fence

Field Border

Filter Strip

Fish Passage

Forest Trails and Landings

Grade Stabilization Structure 

Grassed Waterway

Heavy Use Area Protection

Hedgerow Planting  

Irrigation Storage Reservoir

Irrigation System, Microirrigation

Irrigation System, Sprinkler

Irrigation Water Conveyance, Pipeline, High Pressure, Underground, Plastic

Irrigation Water Conveyance, Pipeline, Low Pressure, Underground, Plastic

Irrigation Water Management

Lined Waterway or Outlet

Manure Transfer

Mulching

Nutrient Management

Pasture and Hay Planting

Pest Management

Pipeline

Pond

Prescribed Burning

Prescribed Forestry

Prescribed Grazing

Pumping Plant

Residue Management, Mulch Till

Residue Management, No Till, Strip Till, Direct Seed

Restoration and Management of Declining Habitats

Riparian Forest Buffer

Roof Runoff Structure

Spring Development 

Stream Crossing

Stream Habitat Improvement

Streambank and Shoreline Protection

Stripcropping

Subsurface Drain

Transition to Organic Production

Underground Outlet

Upland Wildlife Habitat Management

Waste Facility Cover

Waste Field Storage Area

Waste Storage Facility

Waste Treatment

Waste Utilization

Water and Sediment Control Basin

Water Well

Watering Facility

Wetland Wildlife Habitat Management

Windbreak / Shelterbelt Establishment

 

Last Modified: May 08, 2008